Support 1Support 2Support 3
wedmundusagusskola_dohratnatheresia

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Gallery

JADWAL SERTIFIKASI PUSDIKLAT MIGAS CEPU 2018

Sertifikasi Perawatan Sumur PT PERTAMINA EP ASSET 1 FIELD JAMBI

















Kalender

25 June 2018
SunMonTueWedThuFriSat
272829303112
3456789
10111213141516
17181920212223
24252627282930
1234567

Join With Us



Statistik Pengunjung

Sedang Online : 2 Users
Total Hits : 843168 Hits
Hari Ini : 226
Bulan Ini : 3441
Tahun Ini : 19033
Total : 340264

PERSONAL BIOGRAPHY

Nama : Ir. Deddy Nugraha

Gender : M
Qualified : Mechanical Engineer Technical

Pengalaman Kerja, Pelatihan dan Seminar

  • Station Kompressor Gas - PERTAGAS, Plant Integrity Management
  • Carbomethil Cellulose Performance Assessment Plant - PT SIS, Bandung
  • API 570 Pipeline Assessment - PT Biro Klasifikasi Indonesia
  • Optimizing Gas Turbine and Compressor Plant Station - LAPI, ITB
  • Root Cause Failure Analysis of GE Gas Turbine MS7001 - PT Transidea Nusantara
  • Root Cause Failure Analysis Retaining Ring Generator Alstom - PT Transidea Nusantara
  • Evaluation Procedure for HRSG Reverse Engineering - PT Transidea Nusantara
  • Calibration, Instrument and Process Control Engineer
  • Propusion Engineer
  • pipeline integrity management bAndung 2009
  • instrument - safety integrity level bandung 2009
  • rslogix 5000 - allen bradly - Bandung 2008
  • Risk and reliability converence - maprec 2008
  • advanced projeck management- pt semen gresik - bandung 2008
  • O&M generator (siemens) and transformer (hyundai) operation and maintenance 2008
  • Haevy equipment operatioan and Maintenance 2007
  • material handing - warehouse bandung 2007
  • PIPELINE PIGGING - Yogya 2007

 



Copyright © 2011 www.primaxindo.com All Right Reserved
Web Development by